Submission Number: MBTL-SEPA-DEIS-0002334 

Received: 6/9/2016 5:26:20 PM
Commenter: Donna  Childers
Organization: 
State: 

Agency: Cowlitz County and the Washington Department of Ecology
Initiative: Millennium Bulk-Terminals Longview SEPA DEIS
Attachments: No Attachments
Submission Text
The environmental study for the Cowlitz County port should be completed expeditiously. Any American operation that puts people back to work should be supported in these tough economic times. Remember the fact that as Columbia River vessel traffic has declined 30%, from a peak of 2021 ships in the year 2000 to 1404 ships in 2011, increased vessel traffic as the increased volume will be replacing lost vessel traffic not increasing total volumes. Millennium will be a positive impact of increased vessel traffic in such areas as reducing pilotage costs and increasing the port service infrastructure (e.g. additional tugs to serve the lower Columbia River). This project will create additional revenue for a state that, like many others, can really use the economic boost. Through the entire construction process it will employ a significant amount of people and go a long way toward revitalizing Washington. I feel we should make this coal export terminal a reality. Thank you for considering my comments.